Mathematical Plan Model for Longwall Mining in Consideration of Coal-Grade Distribution a Coal Seam.

Bibliographic Information

Other Title
  • 炭層の品位分布を考慮した長壁式採炭に対する数理計画モデル
  • タンソウ ノ ヒンイ ブンプ オ コウリョシタ チョウヘキシキ サイタン ニ

Search this article

Abstract

The purpose of the present study was to develop a mathematical model for effective operation of a longwall working face in an underground coal mine. The model can evaluate the relationship between operating efficiency and working height of the face in a coal seam. The results show that, contrary to a common thought, the working height of the face must be 20-30 % lower than the thickness of the coal seam. As a consequence, low-grade coal near the bed and roof rock remains in the coal seam. The results of this model enable effective operation of the working face and maximum profit in a mine.

Journal

  • Shigen-to-Sozai

    Shigen-to-Sozai 114 (2), 101-105, 1998

    The Mining and Materials Processing Institute of Japan

References(3)*help

See more

Details 詳細情報について

Report a problem

Back to top