SPring-8蓄積リングのビーム試験調整運転時の真空 The Vacuum Conditions at the Beam Commissioning of the SPring-8 Storage Ring

この論文にアクセスする

この論文をさがす

著者

抄録

The vacuum system of the SPring-8 storage ring is being operated favorably without a serious trouble. The ultimate pressure of the storage ring reached approximately 9 × 10<SUP>-9</SUP> Pa after the baking at 140°C for about 1 day. The beam-on pressure just before summer shutdown period decreased by about one order of magnitude as compared with that of the early stage of beam commissioning. The NEG re-activation without baking at summer shutdown period had effects on the improvement of vacuum pressure and the increase of beam lifetime. In this report, the pressure trend of the vacuum system is described as the beam commissioning of the SPring-8 storage ring progresses.

収録刊行物

  • 真空

    真空 42(4), 535-539, 1999-04

    The Vacuum Society of Japan

参考文献:  6件中 1-6件 を表示

  • <no title>

    渡邊剛

    真空 40, 861, 1997

    被引用文献2件

  • <no title>

    YOKOUCHI S.

    RIKEN Accel. Prog. Rep. 23, 134, 1989

    被引用文献1件

  • <no title>

    WATANABE K.

    RIKEN Accel. Prog. Rep. 26, 163, 1992

    被引用文献1件

  • <no title>

    WATANABE K.

    Spring-8 Annual Rep. 126, 1994

    被引用文献2件

  • <no title>

    UEDA S.

    Vacuum 41, 1928, 1990

    被引用文献3件

  • <no title>

    JAERI-RIKEN SPring-8 Project Team

    SPring-8 PROJECT PART I FACILITY DESIGN 1991 [REVISED], 2-93, 1991

    被引用文献1件

各種コード

  • NII論文ID(NAID)
    10002476998
  • NII書誌ID(NCID)
    AN00119871
  • 本文言語コード
    JPN
  • 資料種別
    SHO
  • ISSN
    05598516
  • NDL 記事登録ID
    4750747
  • NDL 雑誌分類
    ZN15(科学技術--機械工学・工業--流体機械)
  • NDL 請求記号
    Z16-474
  • データ提供元
    CJP書誌  NDL  J-STAGE 
ページトップへ