Study on Heat Transfer in Scale-up of Stirred Tank Reactor Using Maxblend Impeller for Continuous Bulk Polymerization.

  • Fuchigami Yoshio
    Methacrylic Resin Production Department, Nakajo Plant, Kuraray Co., Ltd. Kurashiki Plant, Kuraray Co., Ltd.
  • Inami Toshiaki
    Methacrylic Resin Production Department, Nakajo Plant, Kuraray Co., Ltd.
  • Kobayashi Yosokichi
    Methacrylic Resin Production Department, Nakajo Plant, Kuraray Co., Ltd.
  • Hashimoto Akira
    Methacrylic Resin Production Department, Nakajo Plant, Kuraray Co., Ltd.

Bibliographic Information

Other Title
  • マックスブレンド翼を用いる撹はん槽重合反応器のスケールアップにおける伝熱特性
  • マックスブレントヨク R オ モチイル カクハンソウ ジュウゴウ ハンノウキ

Search this article

Abstract

A MaxblendR (MB) impeller was adopted in the mixing reactor for a continuous polymerization reaction. When the liquid level was lower than the top of the impeller and the upper shell cover of the reactor was cooled, the monomer vaporization was accelerated to exceed the amount of the heat transfer from the jacket surface, which offered an effective means to remove the heat of reaction. The rate of monomer vaporization (v) by a MaxblendR impeller changed as a function of the 1.4 th power of the impeller speed, the 0.4 th power of the impeller diameter and the 0.45 th power of the nitrogen flux.<BR>The value of the overall coefficient of heat transfer (Uj) and v were estimated as 304 kJ/m2h°C and 26.7 kg/m2h, respectively for the commercial scale reactor under conditions of Pv = 1. 5 kw/m3 (73 rpm) from the experimental value of Uj = 460 kJ /m2 h°C and v=67 kg/m2h determined from the heat balance of the pilot scale reactor. Based on those values, a commercial reactor with a productivity of 750 kg/h was designed assuming the difference between the jacket temperature and the reaction temperature (Δtj) =-12.8°C. Parameters were found to be Uj =326 kJ/m2h°C, v=31 kg/h (at the purge gas rate of 1/7 that of the pilot scale) and Δtj =-12.5 for the commercial reactor, suggesting that the ability of heat transfer of the commercial reactor was designed conciderably larger than the estimated value.

Journal

References(5)*help

See more

Details 詳細情報について

Report a problem

Back to top