地下連続壁トレミーの閉塞防止対策

  • 水野 直也
    中部電力 (株) 土木建築部火力・原子力開発グループ 知多エル・エヌ・ジー (株) 建設部
  • 永島 三雄
    知多LNG地下式貯槽土木 清水・大林・鹿島・大成共同企業体
  • 牧野 総一
    清水建設 (株) 土木東京支店土木第2部
  • 岡田 武二
    清水建設 (株) 技術研究所

書誌事項

タイトル別名
  • Prevention of Blocking of Tremie for Slurry Wall Construction
  • チカ レンゾクヘキ トレミー ノ ヘイソク ボウシ タイサク

この論文をさがす

抄録

In constructing a particularly deep slurry wall down to a depth of 120 m by the tremie method, the tremie became blocked with concrete during the casting of one of the elements. This demonstrated a need for clarification of the mechanism of tremie clogging, knowledge of which would enable us to improve methods for the trouble-free construction of deep slurry walls. Of particular relevance is deciding on suitable materials and how to mix them, as well as managing concrete quality control and control of the tremie casting process. We have therefore tested concrete for various characteristics, separated it into components for analysis, measured pressures within the tremie, and carried out pressurization and dehydration tests on concrete to determine the. cause of tremie blocking. Based on our measurements, we have reached important conclusions regarding the selection of high-strength, high-fluidity concrete materials and their mixing, as well as regarding other measures to prevent tremie blocking. In this paper, we identify the mechanism of concrete clogging in a tremie and propose measures to prevent it.

収録刊行物

被引用文献 (3)*注記

もっと見る

参考文献 (6)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ