Problems Encountered during the Start-up of UASB Reactors.
-
- BHATTI ZAFAR IQBAL
- Department of Environmental Engineering, Facult of Engineering, Osaka University
Bibliographic Information
- Other Title
-
- UASBリアクターの初期運転における諸問題(ノート)〔英文〕
- UASB リアクター ノ ショキ ウンテン ニ オケル ショモンダイ ノート
Search this article
Abstract
Operational problems during the start-up of upflow anaerobic sludge blanket (UASB) reactors are little reported in the literature. In this study, operational problems during the initial operation of UASB reactors are discussed. Major problems encompass the gas entrapment in the granular sludge bed, formation of scum and crustation, and maintenance of hydraulic retention times (HRTs) at very low flow rates. The experience related to the effect of these problems is addressed in this study together with insight into the remedial measures. Gentle mixing at regular intervals during the initial period is stressed.
Journal
-
- Japanese Journal of Water Treatment Biology
-
Japanese Journal of Water Treatment Biology 31 (1), 59-62, 1995
Japanese Society of Water Treatment Biology
- Tweet
Details 詳細情報について
-
- CRID
- 1390282679938584832
-
- NII Article ID
- 10002798202
-
- NII Book ID
- AN00351126
-
- ISSN
- 18810438
- 09106758
-
- NDL BIB ID
- 3635656
-
- Text Lang
- en
-
- Data Source
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed