Scheduling Methods for Lot Processes in JIT Production System
-
- YOO Jae Kyu
- Graduate School of Engineering Science, Osaka University
-
- HATONO Itsuo
- Information Processing Center, Kobe University
-
- TOMIYAMA Shinji
- Graduate School of Engineering Science, Osaka University
-
- TAMURA Hiroyuki
- Graduate School of Engineering Science, Osaka University
Bibliographic Information
- Other Title
-
- JIT生産におけるロット工程のスケジューリング手法
- JIT セイサン ニ オケル ロット コウテイ ノ スケジューリング シュホウ
Search this article
Abstract
This paper deals with scheduling methods in a JIT production that includes lot processes. In general, the delayes often occurred in multivolume JIT production systems that include lot processes, because set-up time is increased in the multivolume JIT production. To cope with this difficulty, we propose three scheduling methods to decrease delays and work-in-process inventory in lot processes. Furthermore, we evaluated the methods by numerical experiments.
Journal
-
- Transactions of the Institute of Systems, Control and Information Engineers
-
Transactions of the Institute of Systems, Control and Information Engineers 12 (9), 515-521, 1999
THE INSTITUTE OF SYSTEMS, CONTROL AND INFORMATION ENGINEERS (ISCIE)
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282680142121344
-
- NII Article ID
- 10004473449
- 10011464890
-
- NII Book ID
- AN1013280X
-
- ISSN
- 2185811X
- 13425668
-
- NDL BIB ID
- 4870954
-
- Data Source
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed