COST-TIME SCHEDULING OF CONSTRUCTION WORKS EXECUTION

この論文にアクセスする

この論文をさがす

著者

抄録

Cost and time are esential parts of construction works accomplishment. According to the existing circumstances, construction works are analyzed under the deterministic or stochastic conditions. The deterministic conditions are assumed when random factors can be sufficiently eliminated. In opposite case the stochastic conditions must be considered. The requirements of construction works execution are described by using models of construction technology and resources. Scheduling of the works execution are realized by solving mixed linear programming problems under the requirement. In this paper, these are applied to cost-time scheduling of the small bridge erection as an example under stochastic conditions.

収録刊行物

  • 土木学会論文集 = Proceedings of JSCE  

    土木学会論文集 = Proceedings of JSCE 660, 125-134, 2000-10-20 

    Japan Society of Civil Engineers

参考文献:  2件

参考文献を見るにはログインが必要です。ユーザIDをお持ちでない方は新規登録してください。

各種コード

  • NII論文ID(NAID)
    10004836220
  • NII書誌ID(NCID)
    AN10014020
  • 本文言語コード
    ENG
  • 資料種別
    ART
  • ISSN
    02897806
  • NDL 記事登録ID
    5615550
  • NDL 雑誌分類
    ZN1(科学技術--建設工学・建設業)
  • NDL 請求記号
    Z16-6
  • データ提供元
    CJP書誌  NDL  J-STAGE 
ページトップへ