ホタテガイ養殖業の分散・耳吊り作業における作業者と機械設備の最適配分法
書誌事項
- タイトル別名
-
- The Most Suitable Balance between Workers and Facilities for the Thinning and Ear Hanging Work of Scallop Aquaculture.
- ホタテガイ ヨウショクギョウ ノ ブンサン ミミツリ サギョウ ニ オケル サギ
この論文をさがす
抄録
The thinning and ear hanging work of scallop aquaculture can be regarded as a line production system.<br>Previous studies evaluated the optimization of an assembly line using the sum of labor and facility cost per day. This paper introduces a new evaluation measure to improve work system based on two points as follows; (1) To convert the operation efficiency to production cost; and (2) To transform the fixed cost of the facility to a total depreciation per planned production quantity.<br>The results of the calculation show that the new evaluation measure is the most suitable for the work, because the work system optimized by the new evaluation measure has a greatly higher efficiency and fewer facilities than that produced by the previous evaluation measure.
収録刊行物
-
- 日本水産学会誌
-
日本水産学会誌 63 (2), 171-177, 1997
公益社団法人 日本水産学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390282681389680640
-
- NII論文ID
- 10004850716
-
- NII書誌ID
- AN00193422
-
- ISSN
- 1349998X
- 00215392
-
- NDL書誌ID
- 4173457
-
- 本文言語コード
- en
-
- データソース種別
-
- JaLC
- IRDB
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可