抄録

The thinning and ear hanging work of scallop aquaculture can be regarded as a line production system.<br>Previous studies evaluated the optimization of an assembly line using the sum of labor and facility cost per day. This paper introduces a new evaluation measure to improve work system based on two points as follows; (1) To convert the operation efficiency to production cost; and (2) To transform the fixed cost of the facility to a total depreciation per planned production quantity.<br>The results of the calculation show that the new evaluation measure is the most suitable for the work, because the work system optimized by the new evaluation measure has a greatly higher efficiency and fewer facilities than that produced by the previous evaluation measure.

収録刊行物

  • 日本水産学会誌

    日本水産学会誌 63 (2), 171-177, 1997

    公益社団法人 日本水産学会

被引用文献 (5)*注記

もっと見る

参考文献 (15)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ