池島選炭工場の設備改善について  [in Japanese] Improvement of Facilities in Ikeshima Coal Preparation Plant  [in Japanese]

Abstract

Ikeshima coal preparation plant was started operation from 1959. This plant has been conducting many renovations of equipment for 40 years to fit the various demands and changes of markets and also to correspond a number of legal controls. This time, we report about 3 construction work in recent years. At first, in order to increase the capacity and obtain higher accuracy of separation, the main Baum jig (capacity : 300 t/h) has been converted into a VARI=WAVE jig, which has been developed to create a desired wave pattern of pulsation. Secondly, we introduced the Filter Press in order to recover the low grade of fine coal. Finally, we renewed the dust collector because of the handling of the dust which was influenced by the increase moisture content in raw coal.

Journal

Shigen-to-Sozai  

Shigen-to-Sozai 115(13), 1028-1032, 1999-12-25 

The Mining and Materials Processing Institute of Japan

References:  7

You must have a user ID to see the references.If you already have a user ID, please click "Login" to access the info.New users can click "Sign Up" to register for an user ID.

Codes

  • NII Article ID (NAID) :
    10005759137
  • NII NACSIS-CAT ID (NCID) :
    AN10062646
  • Text Lang :
    JPN
  • Article Type :
    SHO
  • ISSN :
    09161740
  • NDL Article ID :
    4946694
  • NDL Source Classification :
    ZP41(科学技術--金属工学・鉱山工学)
  • NDL Call No. :
    Z17-315
  • Databases :
    CJP  NDL  J-STAGE 

Export