池島選炭工場の設備改善について Improvement of Facilities in Ikeshima Coal Preparation Plant

抄録

Ikeshima coal preparation plant was started operation from 1959. This plant has been conducting many renovations of equipment for 40 years to fit the various demands and changes of markets and also to correspond a number of legal controls. This time, we report about 3 construction work in recent years. At first, in order to increase the capacity and obtain higher accuracy of separation, the main Baum jig (capacity : 300 t/h) has been converted into a VARI=WAVE jig, which has been developed to create a desired wave pattern of pulsation. Secondly, we introduced the Filter Press in order to recover the low grade of fine coal. Finally, we renewed the dust collector because of the handling of the dust which was influenced by the increase moisture content in raw coal.

収録刊行物

資源と素材 : 資源・素材学会誌 : journal of the Mining and Materials Processing Institute of Japan  

資源と素材 : 資源・素材学会誌 : journal of the Mining and Materials Processing Institute of Japan 115(13), 1028-1032, 1999-12-25 

社団法人 資源・素材学会

参考文献:  7件

参考文献を見るにはログインが必要です。ユーザIDをお持ちでない方は新規登録してください。

各種コード

  • NII論文ID(NAID) :
    10005759137
  • NII書誌ID(NCID) :
    AN10062646
  • 本文言語コード :
    JPN
  • 資料種別 :
    SHO
  • ISSN :
    09161740
  • NDL 記事登録ID :
    4946694
  • NDL 雑誌分類 :
    ZP41(科学技術--金属工学・鉱山工学)
  • NDL 請求記号 :
    Z17-315
  • 収録DB :
    CJP書誌  NDL  J-STAGE