露天資源開発の現状と新たな展開を支える技術  絶壁端縁部の岩盤崩落抑止工と機械掘削処理

書誌事項

タイトル別名
  • Sudden Rock Fall Prevention Methods and Improved Machine Operations for Excavation Above the Precipice at the Surface Quarry Operation
  • 絶壁端縁部の岩盤崩落抑止工と機械掘削処理
  • ゼッペキ タンエンブ ノ ガンバン ホウラク ヨクシコウ ト キカイ クッサク ショリ

この論文をさがす

抄録

Minowa Mine has been working in west area of Mt. Buko (1,304m above sea level) that is located in southeastern edge of the Chichibu Basin, the western part of Saitama Prefecture. Limestone is produced over 800,000ton a year for cement materials, aggregate materials and lime materials, etc here. Minowa Mine has three benches. One of them, Takeyama bench is situated in west corner of Mt. Buko. At the top bench of Mt. Buko, Minowa Mine, Ryoko Lime Industry Co., Ltd Une Mine and Buko Mining Co., Ltd Buko Mine have been operating in cooperation. It is very difficult to excavate Makuiwa, the huge precipice of north slope below Takeyama bench at the top bench. The excavation was started cautiously around the end of 2000 with setting up benches to prevent sudden falling rocks below the surface quarry. However, massive rock of about 3,000 meters cube, a part of Makuiwa came off and collapsed in April 2002. Moreover, fissure with fear of secondary collapse breaking out was found. Therefore we took preventive measures immediately against collapsing. Since then Makuiwa have been entirely excavated with the improved machine above the precipice with taking preventive measures against collapsing.

収録刊行物

  • 資源と素材

    資源と素材 122 (12), 635-641, 2006

    一般社団法人 資源・素材学会

詳細情報 詳細情報について

問題の指摘

ページトップへ