Performance Evaluation of SCADA System Isolating Fault Section in a Demand Area Power System
-
- Otani Tetsuo
- System Eng. Research Lab., Central Research Institute of Electric Power Industry
-
- Kobayashi Hiromu
- System Eng. Research Lab., Central Research Institute of Electric Power Industry
-
- Koda Yoshiyuki
- Communications Network Center, Tohoku Electric Power Co., Inc.
Bibliographic Information
- Other Title
-
- 需要地系統の事故区間分離に関する監視制御システムの性能評価
- ジュヨウチ ケイトウ ノ ジコ クカン ブンリ ニ カンスル カンシ セイギョ システム ノ セイノウ ヒョウカ
Search this article
Abstract
SCADA (Supervisory Control And Data Acquisition) systems for demand area power systems (one of the next-generation distribution grids) would be required; 1) to be flexible, 2) to provide various functions on restricted computing resources, and 3) to complete processing within the period required. We have proposed a system design based on mobile agents and Ethernet in order to fulfill the first and second requirements. This paper shows that this system design would satisfy the third requirement. In order to validate the system performance, we constructed an experimental system composed of a distribution line, generators, power devices, computers, mobile agents and Ethernet. The experiment results illustrate that a system based on this design could complete the fault isolation process that has the most stringent execution period.
Journal
-
- IEEJ Transactions on Power and Energy
-
IEEJ Transactions on Power and Energy 126 (10), 985-993, 2006
The Institute of Electrical Engineers of Japan
- Tweet
Details 詳細情報について
-
- CRID
- 1390001204602815872
-
- NII Article ID
- 10018780802
-
- NII Book ID
- AN10136334
-
- ISSN
- 13488147
- 03854213
-
- NDL BIB ID
- 8526239
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- Abstract License Flag
- Disallowed