ブラックスタートを模擬した実系統における500kV変圧器の逓昇加圧について Generator Voltage Building-up Field Test for 500kV Transformer Energization for Black-start Power System

この論文にアクセスする

この論文をさがす

著者

抄録

Considering the risk of blackout, Kyushu electric power company has studied about power system restoration at blackout start. Power system at blackout start is so small that over voltage which does not rise in normal power system is able to rise, because of transient phenomena and saturation of transformer which are caused by voltage application. Power system transformers should be applied its voltage as low as possible, ideally from zero, to prevent over-voltage problem. This paper reports field test results of voltage application by a voltage building-up procedure to a 500kV-1000MVA power system transformer through a transmission line.

収録刊行物

  • 電気学会論文誌. B, 電力・エネルギー部門誌 = The transactions of the Institute of Electrical Engineers of Japan. B, A publication of Power and Energy Society  

    電気学会論文誌. B, 電力・エネルギー部門誌 = The transactions of the Institute of Electrical Engineers of Japan. B, A publication of Power and Energy Society 128(4), 641-646, 2008-04-01 

    The Institute of Electrical Engineers of Japan

参考文献:  4件

参考文献を見るにはログインが必要です。ユーザIDをお持ちでない方は新規登録してください。

各種コード

  • NII論文ID(NAID)
    10021130602
  • NII書誌ID(NCID)
    AN10136334
  • 本文言語コード
    JPN
  • 資料種別
    ART
  • ISSN
    03854213
  • NDL 記事登録ID
    9451042
  • NDL 雑誌分類
    ZN31(科学技術--電気工学・電気機械工業)
  • NDL 請求記号
    Z16-794
  • データ提供元
    CJP書誌  NDL  J-STAGE 
ページトップへ