書誌事項
- タイトル別名
-
- Generator Voltage Building-up Field Test for 500kV Transformer Energization for Black-start Power System
- ブラックスタート オ モギシタ ジツケイトウ ニ オケル 500kV ヘンアツキ ノ テイショウ カアツ ニ ツイテ
この論文をさがす
抄録
Considering the risk of blackout, Kyushu electric power company has studied about power system restoration at blackout start. Power system at blackout start is so small that over voltage which does not rise in normal power system is able to rise, because of transient phenomena and saturation of transformer which are caused by voltage application. Power system transformers should be applied its voltage as low as possible, ideally from zero, to prevent over-voltage problem. This paper reports field test results of voltage application by a voltage building-up procedure to a 500kV-1000MVA power system transformer through a transmission line.
収録刊行物
-
- 電気学会論文誌B(電力・エネルギー部門誌)
-
電気学会論文誌B(電力・エネルギー部門誌) 128 (4), 641-646, 2008
一般社団法人 電気学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390001204603001728
-
- NII論文ID
- 10021130602
-
- NII書誌ID
- AN10136334
-
- ISSN
- 13488147
- 03854213
-
- NDL書誌ID
- 9451042
-
- 本文言語コード
- ja
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可