抄録
Analysis of the EMTP transformer model was performed with the 4kVA two windings low voltage transformer with the current injection (CIJ) measurement method to study a transient recovery voltage (TRV) at the transformer limited fault (TLF) current interrupting condition. Tested transformers impedance was measured by the frequency response analyzer (FRA). From FRA measurement graphs leakage inductance, stray capacitance and resistance were calculated. The EMTP transformer model was constructed with those values. The EMTP simulation was done for a current injection circuit by using transformer model. The experiment and simulation results show a reasonable agreement.
収録刊行物
- 電気学会論文誌. B, 電力・エネルギー部門誌 = The transactions of the Institute of Electrical Engineers of Japan. B, A publication of Power and Energy Society
-
電気学会論文誌. B, 電力・エネルギー部門誌 = The transactions of the Institute of Electrical Engineers of Japan. B, A publication of Power and Energy Society 129(10), 1174-1180, 2009-10-01
社団法人 電気学会