Read/Search this Article
Abstract
This paper deals with a problem of optimizing all decision features such as loading, lot sizing, lot sequencing, and dispatching in a multi-item multi-process dynamic lot size scheduling simultaneously. Clarifying that the complementary slackness theorem does not hold in the optimal solution of this sort of scheduling problems and its reason, we present an algorithm for obtaining a near optimal solution. Finally, we illustrate a numerical example.
Journal
- Proceedings of International Symposium on Scheduling [List of Volumes]
-
Proceedings of International Symposium on Scheduling 2002, 121-124, 2002 [Table of Contents]
The Japan Society of Mechanical Engineers