PC 工法の生産分析 : その 3・特殊生産システム, 特殊形状部材, 鉄筋組立工程における労務量

書誌事項

タイトル別名
  • PRODUCTION ANALYSIS OF PRE-CAST CONCRETE CONSTRUCTION : (Part 3) Man-hours involved in production of pre-cast concrete components in some peculiar production systems and of some particular types of components, and man-hours involved in steel unit assembly
  • PC工法の生産分析-3-特殊生産システム,特殊形状部材,鉄筋組立工程における労務量
  • PC コウホウ ノ セイサン ブンセキ 3 トクシュ セイサン システム トク

この論文をさがす

抄録

This is the third report of Production Analysis of Pre-cast Concre Construction. In the former reports we stated : 1) the purpose of this study. 2) the explanation of production analysis on building construction. 3) A detailed method of analysis And we also reported the amount of man-hours of usual pre-cast concrete components in relation to their different forms. In this report we analyze the man-hours involved in the production of pre-cast concrete components in a flow line production system and a battery-type production system in an effort to study the difference in production methods. Secondly, we report on the man-hours in the production of some particluar form of components including, three dimensional components, cartain-walls, ribbedslabs, staircomponents. Thirdly, we report on the man-hours in volved in the assembling of steel units which is to be included in th pre-cast concrete components.

収録刊行物

被引用文献 (2)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ