- PRODUCTION ANALYSIS OF PRE-CAST CONCRETE CONSTRUCTION : (Part 3) Man-hours involved in production of pre-cast concrete components in some peculiar production systems and of some particular types of components, and man-hours involved in steel unit assembly
- PC工法の生産分析-3-特殊生産システム,特殊形状部材,鉄筋組立工程における労務量
- PC コウホウ ノ セイサン ブンセキ 3 トクシュ セイサン システム トク
この論文をさがす
抄録
This is the third report of Production Analysis of Pre-cast Concre Construction. In the former reports we stated : 1) the purpose of this study. 2) the explanation of production analysis on building construction. 3) A detailed method of analysis And we also reported the amount of man-hours of usual pre-cast concrete components in relation to their different forms. In this report we analyze the man-hours involved in the production of pre-cast concrete components in a flow line production system and a battery-type production system in an effort to study the difference in production methods. Secondly, we report on the man-hours in the production of some particluar form of components including, three dimensional components, cartain-walls, ribbedslabs, staircomponents. Thirdly, we report on the man-hours in volved in the assembling of steel units which is to be included in th pre-cast concrete components.
収録刊行物
-
- 日本建築学会論文報告集
-
日本建築学会論文報告集 226 (0), 21-27,102, 1974
一般社団法人 日本建築学会
- Tweet
詳細情報 詳細情報について
-
- CRID
- 1390282680515526784
-
- NII論文ID
- 110003880853
-
- NII書誌ID
- AN0018882X
-
- ISSN
- 24330027
- 03871185
-
- NDL書誌ID
- 1579686
-
- 本文言語コード
- ja
-
- データソース種別
-
- JaLC
- NDL
- Crossref
- CiNii Articles
-
- 抄録ライセンスフラグ
- 使用不可