3A3 IMPROVEMENT OF HEURISTIC METHOD FOR PRODUCTION PLANNING PROBLEM IN AUTO PARTS SUPPLIER(Technical session 3A : Sophisticated scheduling 1)

    • MATSUMOTO Shimpei
    • Department of Management and Information Sciences, Hiroshima Prefectural University
    • OKUHARA Koji
    • Department of Management and Information Sciences, Hiroshima Prefectural University
    • UENO Nobuyuki
    • Department of Management and Information Sciences, Hiroshima Prefectural University
    • TANAKA Toshijiro
    • Department of Management and Information Sciences, Hiroshima Prefectural University

Abstract

We are interested in the print process on the manufacturing processes of auto parts supplier as an actual problem. The purpose of this research is to apply our scheduling technique developed in university to the actual print process in a private corporation. Rationalization of the print process is depending on the lot sizing. The manufacturing lead time of the print process is long, and in the present method, production is done depending on worker's experience and intuition. The construction of an efficient production system is urgent problem. Therefore, in this paper, in order to shorten the entire manufacturing lead time and to reduce the stock, we reexamine the usual method of the lot sizing rule based on heuristic technique, and we propose the improvement method which can plan a more efficient schedule.

Journal

Proceedings of International Symposium on Scheduling   [List of Volumes]

Proceedings of International Symposium on Scheduling 2004, 115-120, 2004-05-24  [Table of Contents]

The Japan Society of Mechanical Engineers

Preview

Preview

Codes

  • NII Article ID (NAID) :
    110004075018
  • NII NACSIS-CAT ID (NCID) :
    AA11901544
  • Text Lang :
    ENG
  • Databases :
    NII-ELS 

Export