単位工期概算式の定式化 : 建設工期の算定方法に関する研究(その3)

書誌事項

タイトル別名
  • FORMULARIZING AN EQUATION FOR CALCULATING THE APPROXIMATE CONSTRUCTION PERIOD : Study on method for calculating construction period(Part 3)
  • タンイ コウキ ガイサンシキ ノ テイシキカ ケンセツ コウキ ノ サンテイ ホウホウ ニ カンスル ケンキュウ ソノ 3

この論文をさがす

抄録

We have been studying the method for calculating the construction period of buildings. In part 3 of this study, we demonstrated the equation to calculate the approximate construction period, in the light of the scale effect of buildings and the self-similarity of construction works. 1) In our conclusion, this-equation of day/m^2 is formularized as form (1). 2) If you wish to calculate the construction period of day more accurately, you should use form (2) and table (3). However, table (3) includes the differences because of the regression coefficients derived from data of buildings constructed. In next part, we will provide more accurate coefficients in form (2) from data of model buildings.

収録刊行物

被引用文献 (1)*注記

もっと見る

参考文献 (14)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ