System Outline and Operational Status of Karita Power Station New Unit 1 (PFBC)(<Special Issue>International Conferences on Power and Energy System)

Abstract

Karita Power Station New Unit 1, which started commercial operation on July 3, 2001, has adopted the new power generation system PFBC, Pressurized Fluidized Bed Combustion, a combined cycle generation system. The system boasts high thermal efficiency, excellent environmental characteristics and compact size. Output from the steam turbine generator and gas turbine generator is 290MW and 75MW, respectively, with total output adjusted to 360MW, making the unit the largest PFBC plant in the world. In October 2002, combustion tests were conducted using an anthracite coal from Yangquan; and in April 2003, a world record was achieved for continuous operation hours of a PFBC plant. This paper focuses on the outline and operation status of Karita New Unit 1.

Journal

JSME international journal. Ser. B, Fluids and thermal engineering   [List of Volumes]

JSME international journal. Ser. B, Fluids and thermal engineering 47(2), 193-199, 2004-05-15  [Table of Contents]

The Japan Society of Mechanical Engineers

References:  5

You must have a user ID to see the references.If you already have a user ID, please click "Login" to access the info.New users can click "Sign Up" to register for an user ID.

Preview

Preview

Codes

  • NII Article ID (NAID) :
    110004826601
  • NII NACSIS-CAT ID (NCID) :
    AA10888815
  • Text Lang :
    ENG
  • Article Type :
    ART
  • ISSN :
    13408054
  • NDL Article ID :
    6939762
  • NDL Source Classification :
    ZN11(科学技術--機械工学・工業)
  • NDL Call No. :
    Z53-Y271
  • Databases :
    CJP  NDL  NII-ELS  J-STAGE