Abstract
In this research, we proposed the method for controlling the trade-off between the calculation cost and the performance of the solution for obtaining the schedule solution in process scheduling. Since computational cost indispensable in order to calculate the schedule solution corresponding to a demand cannot be predicted, it uses the policy of improving a solution gradually to require a provisional solution. The reptition is completed when a schedule solution with the desired cost performance while this system monitors calculation time is obtained.Such a technique was built using the knowledge based system, implemented and evaluated.
Journal
- 年次大会講演論文集 : JSME annual meeting [List of Volumes]
-
年次大会講演論文集 : JSME annual meeting 2005(4), 3-4, 2005-09-18 [Table of Contents]
The Japan Society of Mechanical Engineers