2503 段取り時間を考慮した動的生産スケジューリングシステム(S77-1 生産システムの新展開-基礎(1),S77 生産システムの新展開(基礎理論を中心に))  [in Japanese] 2503 Dynamic Production Scheduling System that Considers Set-up Time  [in Japanese]

Abstract

The concept of autonomous & distributed production systems has been proposed in order to cope with various disturbances in recent years. However, it is required for the production system to realize more high flexibility and performance. In this paper, dynamic production scheduling system that considers set-up time is proposed. We focused on the combination and timing of processing sequences on both processing cells/parts, analyzed set-up time in detail, and proposed timing rule and set-up time rule in selection. Then, these rules are introduced in dynamic production scheduling system and applied to a case study.

Journal

年次大会講演論文集 : JSME annual meeting   [List of Volumes]

年次大会講演論文集 : JSME annual meeting 2005(4), 5-6, 2005-09-18  [Table of Contents]

The Japan Society of Mechanical Engineers

Preview

Preview

Codes

  • NII Article ID (NAID) :
    110006190874
  • NII NACSIS-CAT ID (NCID) :
    AA11461871
  • Text Lang :
    JPN
  • Databases :
    NII-ELS