リエントラントフローショップスケジューリング問題に関する研究(第1報) : 数理計画法による最適化 Study on Re-entrant Flowshop Scheduling Problem (1st report) : Optimization by Mathematical Programming

抄録

A new theoretical formulation for re-entrant flow shop scheduling problem is derived to plan an optimum production schedule by mixed integer programming. Flow time, which is an index of the evaluation of the planned schedule, is minimized to decrease amount of work-in-process. Cycle time, which is another important index, is determined by the total load time on a bottleneck machine to manufacture the products at the highest productivity. Both objective function and constraint conditions are described in linear expressions and a general optimization tool is adopted to solve the formulated scheduling problems. Another objective function is also introduced in order to shorten the time for the optimization. Computational scheduling results obtained by the optimization are evaluated and discussed in the present paper.

収録刊行物

精密工学会誌   [巻号一覧]

精密工学会誌 74(10), 1119-1124, 2008-10-05  [この号の目次]

公益社団法人精密工学会

被引用文献:  1件

被引用文献を見るにはログインが必要です。ユーザIDをお持ちでない方は新規登録してください。

プレビュー

プレビュー

各種コード

  • NII論文ID(NAID) :
    110006951294
  • NII書誌ID(NCID) :
    AN1003250X
  • 本文言語コード :
    JPN
  • 資料種別 :
    雑誌論文
  • ISSN :
    09120289
  • NDL 記事登録ID :
    9678797
  • NDL 雑誌分類 :
    ZN12(科学技術--機械工学・工業--精密機械)
  • NDL 請求記号 :
    Z16-466
  • 収録DB :
    CJP引用  NDL  NII-ELS  J-STAGE