Read/Search this Article
Abstract
As a multi-mission GEO satellite, Communication, Ocean, and Meteorological Satellite (COMS) is scheduled to be launched in the year 2009. COMS has three different payloads: Ka-band communication payload, Geostationary Ocean Color Imager (GOCI) and Meteorological Imager (MI). Among the three payloads, MI and GOCI have several conflict relationships; one of them is that if MI mirror moves vertically larger than 4 LOS angle while GOCI is imaging, image quality of GOCI becomes degraded. In this paper, MI scheduling algorithm to prevent GOCI's image quality degradation will be presented.
Journal
- Technical report of IEICE. SAT [List of Volumes]
-
Technical report of IEICE. SAT 108(274), 57-62, 2008-10-30 [Table of Contents]
The Institute of Electronics, Information and Communication Engineers
Share