B-63 Study on a Ground Snow Melting Tank Using Rotating Press-in Steel Pile : Part 4 Snow melting performance by snow charge with water spray

DOI

Bibliographic Information

Other Title
  • B-63 回転圧入鋼管杭の適用による地中熱利用型融雪槽に関する研究 : その4 散水時の融雪能力

Abstract

Field experiments have been carried out in the Hokkaido region with Ground Snow Melting Tanks (GSMT). Larger amount of snow can be charged by the use of shower. The total amount of snow melting is around 15.3 tons in 39 days when snow is shoveled periodically by a snow blower with the shower and nearly filled in the GSMT. The result of a numerical calculation indicates that the use of the shower can increase the snow melting performance.

Journal

Details 詳細情報について

  • CRID
    1390001205242296960
  • NII Article ID
    110009775755
  • DOI
    10.18948/shasetaikai.2007.3.0_1769
  • ISSN
    24242179
    18803806
  • Text Lang
    ja
  • Data Source
    • JaLC
    • CiNii Articles
  • Abstract License Flag
    Disallowed

Report a problem

Back to top