抄録

The second berth for LNG tankers has been constructed at Senboku LNG terminal II of Osaka Gas Co., Ltd. to meet its increasing demands of LNG reception. In the course of design and construction, much efforts have been made to reduce skill requirement, to save cost, and to realize safety.<br>Actually in our practice, an automatic unloading arms operation system was developed for skill free and safety operation. In the construction of marine pipe racks and working platform, prefab method was introduced transporting pre-assembled elements from the manufacturer's factory by sea for cost saving. In the land area, LNG unloading pipe line was laid in culvert for farther safety. This report presents the overview of the engineering records of the second berth.

収録刊行物

  • 圧力技術

    圧力技術 33 (6), 288-295, 1995

    一般社団法人 日本高圧力技術協会

詳細情報 詳細情報について

  • CRID
    1390001204616521472
  • NII論文ID
    130004092047
  • DOI
    10.11181/hpi1972.33.288
  • ISSN
    13479598
    03870154
  • 本文言語コード
    ja
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ