釧路東地区における地盤改良工事

DOI

書誌事項

タイトル別名
  • Soil Improvement of East Kushiro Project

抄録

The Kushiro Higashi section of the wide area farm road is located in the nearly central part of the area of jurisdiction of Kushiro Branch Office in eastern Hokkaido.Of this, the first phase construction section passes through the Kushiro Marshland which is a weak ground.In the Hirosato Bridge area, sliding failure, residual sinking, the side flow of the abutments, the deformation of headrace culverts and so on were expected.As the countermeasures against them, it was decided to carry out the soil improvement, and for the backside of the abutments, the stabilizing methed of mixing in deep strata, and for the road part, the construction method of crushed stone compaction and piling were executed.<BR>In this paper, the outline of these works is shown, and the designmethod, the procedure of execution, the method of execution management and so on of respective construction are reported.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390001204541399040
  • NII論文ID
    130004347903
  • DOI
    10.11408/jsidre1965.1994.47
  • ISSN
    18847234
    03872335
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ