長尺切羽補強工を施工した切羽前方地山の挙動について

DOI
  • 清水 利郎
    熊谷・前田・鴻治共同企業体安芸府中トンネル作業所
  • 尾畑 洋
    熊谷・前田・鴻治共同企業体安芸府中トンネル作業所
  • 松尾 勉
    (株) 熊谷組土木事業本部トンネル技術部
  • 手塚 仁
    (株) 熊谷組土木事業本部トンネル技術部
  • 岡部 正
    (株) ケー・エフ・シートンネル技術室

書誌事項

タイトル別名
  • Behavior of the ground ahead of the face reinforced with long GFRP face forepiling

抄録

The Aki-Fuchu twin tunnels on the Hiroshima Expressway No.1 have two lanes each, with 30 to 40 m overburden. The geology of that region is composed of heavily weathered granite and diorite, which are extremely decomposed due to deep weathering. Therefore, the tunnel face is unstable and the convergence is noticeable. For ensuring face stability, tunneling is advanced with long face forepiling using glass fiber reinforced plastic tubes. The long face forepiling has found wider applications these days. However, almost no quantitative measurement data are available at present. In this context, the authors determined the ground behavior by measuring the axial force in the long face forepiles and the displacement ahead of the face, and quantitatively evaluated the effect of this technique by conducting numerical analysis.

収録刊行物

詳細情報 詳細情報について

  • CRID
    1390282680376862464
  • NII論文ID
    130004387024
  • DOI
    10.11532/journalte1991.13.225
  • ISSN
    18849091
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ