新虎通りにおけるCVMを用いた街路樹事業の費用便益分析

書誌事項

タイトル別名
  • COST-BENEFIT ANALYSIS OF THE ROADSIDE TREE PROJECT BY USING CONTINGENT VALUATION METHOD AT SHINTORA STREET
  • シン トラ ドオリ ニ オケル CVM オ モチイタ ガイロジュ ジギョウ ノ ヒヨウ ベンエキ ブンセキ

この論文をさがす

抄録

In this study, I perform a cost-benefit analysis of the roadside tree project in the planning stage, by using the method of CVM. In CVM survey of trees project model in the Toranomon Street, I used two types of survey. (One shows the results of the thermal environment simulation, one does not) There was no difference between the result of the survey. As a result of the cost-benefit analysis, cost-benefit ratio from seven years after the effect was presented in the questionnaire begins obtained are more than 1, could be evaluated the roadside tree project is that it is reasonable.