Search Results1-7 of  7

  • ANDO Ainosuke ID: 9000018463669

    J-PARCセンター (2010 from CiNii)

    Articles in CiNii:1

    • Outline of J-PARC Facility (2010)
  • ANDO Ainosuke ID: 9000107345490

    New SUBARU, LASTI, Hyogo University (2005 from CiNii)

    Articles in CiNii:1

    • Electron Redistribution and Coherent Radiation of Laser-Sliced Beam Bunches in Storage Ring (2005)
  • Ando Ainosuke ID: 1000010360835

    JASRI (2015 from CiNii)

    Articles in CiNii:16

    • SPring-8 Top-up operation present status and future prospect : Aiming at Perfect Top-up Operation (2005)
    • Development of a Compact Photon Absorber for a Multi-pole Wiggler (2005)
    • Operation with highly purified isolated bunches at SPring-8 (2006)
  • Ando Ainosuke ID: 9000025087346

    Articles in CiNii:1

    • Upgrade of NewSUBARU with superconducting magnets (2007)
  • Ando Ainosuke ID: 9000252926942

    Laboratory of Advanced Science and Technology for Industry, Himeji Institute of Technology (2000 from CiNii)

    Articles in CiNii:1

    • B. レーザー装置 (2000)
  • Ando Ainosuke ID: 9000252947848

    Articles in CiNii:1

    • Chromaticity correction in the KEK main ring. (1980)
  • Ando Ainosuke ID: 9000255728139

    Articles in CiNii:1

    • Physics of Beam. (1997)

Page Top