Search Results1-20 of  69

  • 1 / 4
  • OBA Fuminori ID: 9000005521023

    広島大学 大学院 工学研究科 (2002 from CiNii)

    Articles in CiNii:1

    • 2002 Japan-U.S.A. Symposium on Flexible Automation (2002JUSFA) (2002)
  • OBA Fuminori ID: 9000006130244

    Department of Mechanical System Engineering, Hiroshima University (2006 from CiNii)

    Articles in CiNii:2

    • Production Planning and Simulation for Reverse Supply Chain (2006)
    • Production Planning and Simulation for Reverse Supply Chain(Manufacturing systems and Scheduling) (2005)
  • OBA Fuminori ID: 9000020031318

    Articles in CiNii:1

    • A Method for Optimum Design of Frame Structures Based on Reliability Analysis (1979)
  • OBA Fuminori ID: 9000020126129

    Articles in CiNii:1

    • Optimum Machining Conditions for Flow-Type Multistage Machining Systems (1977)
  • OBA Fuminori ID: 9000020129876

    Articles in CiNii:1

    • Reliability Analysis of Structural Systems Following Multi-Dimensional Normal Distribution (1978)
  • OBA Fuminori ID: 9000020232114

    Articles in CiNii:1

    • A Study of Part Description Method for Computer Aided Manufacturing System : 2nd Report, Extention to Three-Dimensional Parts (1978)
  • OBA Fuminori ID: 9000021428372

    Articles in CiNii:1

    • Optimum Design of Structures Based on Reliability Concept (1980)
  • OBA Fuminori ID: 9000107345508

    Articles in CiNii:1

    • A Machine Selection Rule for Dynamic Job Shop having Alternative Machines with Different Processing Times (2006)
  • OBA Fuminori ID: 9000255771867

    Articles in CiNii:1

    • Study on Parts Description Method for Computer Aided Manufacturing System : 3rd Report, Machining Shape Element and Its Role in Production Planning (1980)
  • OBA Fuminori ID: 9000255772008

    Articles in CiNii:1

    • Optimum Job-Shop Scheduling by Integrating the Selection of Machine Tools with the Determination of Loading Sequences of Parts (1980)
  • OBA Fuminori ID: 9000255772198

    Articles in CiNii:1

    • Solution of Large Scale Job-Shop Type Scheduling Problems with Alternative Machines (1981)
  • OBA Fuminori ID: 9000255772202

    Articles in CiNii:1

    • An Analytical Approach to Machine Tool Design : Modeling and Analysis of Shape Generation Processes of Machine Tools (1981)
  • OBA Fuminori ID: 9000255772398

    Articles in CiNii:1

    • Large Scale Job-Shop Type Scheduling Problem Considering Transportation System and Buffer Storage (1983)
  • OBA Fuminori ID: 9000255772403

    Articles in CiNii:1

    • Study of Generative Type Production Planning System for Rotational Parts (1983)
  • OBA Fuminori ID: 9000255772946

    Articles in CiNii:1

    • System design for flexible manufacturing systems (4th report, System configuration of the cellular manufacturing system and layout of cells) (1986)
  • OBA Fuminori ID: 9000255780805

    Articles in CiNii:1

    • 3D Positioning Method for Mobile Robot Using Laser and Tilting Reflectors. (2002)
  • OBA Fuminori ID: 9000255780984

    Articles in CiNii:1

    • Robust Dead-Reckoning System with Function on Sensor-Fault Diagnosis for Mobile Robot. (2002)
  • OBA Fuminori ID: 9000255782183

    Graduate School of Engineering, Hiroshima University (2006 from CiNii)

    Articles in CiNii:1

    • Dynamic Scheduling with Processing Time Uncertainty Using the Mixture of Periodic Optimization and Real-time Scheduling (2006)
  • OBA Fuminori ID: 9000255782211

    広島大学大学院工学研究科 (2006 from CiNii)

    Articles in CiNii:1

    • Multi-Moving Target Tracking with In-Vehicle Laser Range Sensor (2006)
  • OBA Fuminori ID: 9000255782272

    広島大学工学研究科 (2006 from CiNii)

    Articles in CiNii:1

    • Simulation-based Evaluation of Forward and Reverse Supply Chain (2006)
  • 1 / 4
Page Top