Development of a Scheduling Algorithm for Resource Leveling in Local Time Intervals

Bibliographic Information

Other Title
  • 資源山積みの局所区分平準化を考慮した工程計画アルゴリズムの開発
  • シゲン ヤマズミ ノ キョクショ クブン ヘイジュンカ オ コウリョシタ コウ

Search this article

Abstract

We have developed a scheduling algorithm, which simultaneously levels resourcece profiles in both the total time span and local time intervals, for plant construction schedule optimization. Resource leveling in local time intervals minimizes resource peaks through a heuristic search method with a target profile.<br>The developed scheduling algorithm has been experimentally evaluated with realistic construction data of a power plant. The resulting profile from overall resource leveling have been improved with the local resource leveling function. From the results it is confirmed that the local leveling is helpful in resource peak reduction.

Journal

References(8)*help

See more

Details 詳細情報について

Report a problem

Back to top