大区画水田造成のための均平管理基準

書誌事項

タイトル別名
  • Leveling Standard for Large-sized Paddy Field
  • ダイクカク スイデン ゾウセイ ノ タメ ノ キンペイ カンリ キジュン

この論文をさがす

抄録

Every farmer customized their consolidated field with leveling works. The load of leveling works is assumed with the amount of transported earth that could be obtained as the product of cutting and banking volume and transport distance. In this paper, the author dealed with the standard land of leveling for large-sized paddy field from the point of earth transportation work.<BR>When current leveling standard for 30 are lot is applied to large-sized paddy field, more load of earth transportation is needed than applying the same standard to 30 are lot. Under the present leveling standard, introducing large-sized paddy field forces the farmers to bear the load of leveling works than present. On the other hand, in state of restricted standard, the builder would bear more load.<BR>Therefore, large-sized paddy field would segment the new leveling standard which is acceptableboth by the farmers population and by the builders.

収録刊行物

被引用文献 (4)*注記

もっと見る

参考文献 (6)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ