分散型電源連系課題解決支援実験システム (ANSWER) の構築と分散型電源と配電ネットワークとの協調運用形態の実験検証  [in Japanese] Development of Distribution Network Equipment to Support the Solution of Problem of Connecting Distributed Generators (ANSWER) and Verification Experiment of Active Coordinated Operation of Distributed Generator and Distribution Network  [in Japanese]

Access this Article

Search this Article

Author(s)

    • 酒井 重和 SAKAI Shigekazu
    • 福井大学大学院工学研究科 電気・電子工学専攻 Graduate School of Electrical and Electronics Engineering, University of Fukui
    • 林 泰弘 HAYASHI Yasuhiro
    • 早稲田大学理工学部電気・情報生命工学科 School of Advanced Science and Engineering, Dept. of Electrical Eng. and Bioscience, Waseda University
    • 川崎 章司 [他] KAWASAKI Shoji
    • 福井大学大学院工学研究科 電気・電子工学専攻 Graduate School of Electrical and Electronics Engineering, University of Fukui
    • 松木 純也 MATSUKI Junya
    • 福井大学大学院工学研究科 電気・電子工学専攻 Graduate School of Electrical and Electronics Engineering, University of Fukui
    • 北條 昌秀 HOJO Masahide
    • 徳島大学工学部電気電子工学科 Dept. of Electrical and Electronic Engineering, The University of Tokushima
    • 若尾 真治 WAKAO Shinji
    • 早稲田大学理工学部電気・情報生命工学科 School of Advanced Science and Engineering, Dept. of Electrical Eng. and Bioscience, Waseda University
    • 森 健二郎 MORI Kenjiro
    • 東京電力(株)電力流通本部配電部配電技術グループ Distribution Engineering Group, Distribution Department, Tokyo Electric Power Company
    • 不破 由晃 FUWA Yoshiaki
    • 東京電力(株)電力流通本部配電部配電技術グループ Distribution Engineering Group, Distribution Department, Tokyo Electric Power Company

Abstract

Recently, total number of distributed generators (DGs) such as photovoltaic generation system and wind power generation system connected to an actual distribution network increases drastically. The distribution network connected with many distributed generators must be operated keeping reliability of power supply, and power quality. In order to accomplish active distribution network operation to take advantage of many connections of DGs, a new coordinated operation of distribution system with many connections of DGs is necessary. So far, the authors have proposed a coordinated operation of distribution network system connected with many DGs by using sectionalizing switches control method, sending voltage control method, computation method of acceptable maximum output of DG and determination method of optimal smoothing time constant of wind power generation system with storage battery. In this paper, the authors develop an experiment of scaled-down three-phase distribution system with distributed generators in order to check the validity of the proposed approach.

Journal

  • IEEJ Transactions on Power and Energy

    IEEJ Transactions on Power and Energy 130(5), 473-483, 2010-05-01

    The Institute of Electrical Engineers of Japan

References:  14

Cited by:  3

Codes

  • NII Article ID (NAID)
    10026226892
  • NII NACSIS-CAT ID (NCID)
    AN10136334
  • Text Lang
    JPN
  • Article Type
    Journal Article
  • ISSN
    03854213
  • NDL Article ID
    10662087
  • NDL Source Classification
    ZN31(科学技術--電気工学・電気機械工業)
  • NDL Call No.
    Z16-794
  • Data Source
    CJP  CJPref  NDL  J-STAGE 
Page Top