Present Status and Prospects for PFI/PPP at General Waste Facilities

  • Urabe Shinro
    Osaka Institute of Technology ; Urban System Integration, Inc.

Bibliographic Information

Other Title
  • 廃棄物処理施設における民間活力の活用に関する動向について
  • ハイキブツ ショリ シセツ ニ オケル ミンカン カツリョク ノ カツヨウ ニ カンスル ドウコウ ニ ツイテ

Search this article

Abstract

In Japan, commissions for the design, construction, operation, and maintenance of general waste facilities have been outsourced to the private sector for the past ten years. This paper discusses the background behind this trend and other factors involved. Our results suggest that before the number of general waste facilities being put under PFI/PPP increases, the scheme needs further consideration with regard to factors such as monitoring systems, etc.

Journal

References(7)*help

See more

Details 詳細情報について

Report a problem

Back to top