スケジューリングに基づく生産設備の再配置(第1報) : 設備配置に対する評価値としてのスケジュールの導入  [in Japanese] Resource Reallocation Based on Production Scheduling (1st report) : Adoption of Schedule as Index for Resource Allocation  [in Japanese]

Access this Article

Search this Article

Author(s)

Abstract

This paper describes a method to improve allocation and re-allocation of resources in manufacturing systems, such as machine tools and robots that are linked by carriers such as AGVs. The proposed method uses the result of scheduling as an index of suitability of the resource allocation. The behaviors of AGV are analyzed and included in the production scheduling problem. The production scheduling problem is solved by employing some well-known dispatching rules. The search for the best scheduling is executed for different assignment of resource allocation, and the suitability of the resource allocation is evaluated based on the schedule obtained. The procedure is repeated to improve the allocation of the resources by applying simulated annealing method. The validity of the proposed method is verified by computational simulations for typical production scheduling problems.

Journal

  • Journal of the Japan Society for Precision Engineering

    Journal of the Japan Society for Precision Engineering 69(5), 655-659, 2003-05-05

    The Japan Society for Precision Engineering

References:  12

Cited by:  4

Codes

  • NII Article ID (NAID)
    110001373549
  • NII NACSIS-CAT ID (NCID)
    AN1003250X
  • Text Lang
    JPN
  • Article Type
    Journal Article
  • ISSN
    09120289
  • NDL Article ID
    6578107
  • NDL Source Classification
    ZN12(科学技術--機械工学・工業--精密機械)
  • NDL Call No.
    Z16-466
  • Data Source
    CJP  CJPref  NDL  NII-ELS  J-STAGE 
Page Top