中国における建築プロジェクトの品質確保に関する研究 : 中国と日本における建築プロジェクトマネジメントの比較研究その4  [in Japanese] STUDY ON QUALITY ASSURANCE IN CHINESE CONSTRUCTION PROJECT : A comparative study on construction project management between China and Japan Part 4  [in Japanese]

Access this Article

Search this Article

Author(s)

Abstract

For many years the construction industry in China, combined with the poor project management skills of the enterprises, resulted in low-quality work and the late completion of projects. Although great efforts have been achieved, such as maintenance of law, applying total quality management (TQC) and ISO9000s, a number of quality management problems still remain unsolved. In this paper the authors made a survey of several construction projects; aim at analyzing the typical procurement of Chinese construction project, and make clear the responsibility allotment relation of the client, the architect, the supervisor, the construction manager, the general contractor and the sub-contractors.

Journal

  • Journal of Architecture and Planning (Transactions of AIJ)

    Journal of Architecture and Planning (Transactions of AIJ) 72(622), 175-180, 2007

    Architectural Institute of Japan

References:  9

Codes

  • NII Article ID (NAID)
    110006475602
  • NII NACSIS-CAT ID (NCID)
    AN10438548
  • Text Lang
    JPN
  • Article Type
    journal article
  • ISSN
    1340-4210
  • NDL Article ID
    9282393
  • NDL Source Classification
    ZN1(科学技術--建設工学・建設業)
  • NDL Call No.
    Z16-107
  • Data Source
    CJP  NDL  NII-ELS  J-STAGE  AIJ 
Page Top