The Development and Operation of Coke Dry Quenching with Double Flues

Bibliographic Information

Other Title
  • 2段フリュー式コークス乾式消火設備の開発と操業
  • 2ダン フリューシキ コークス カンシキ ショウカ セツビ ノ カイハツ ト

Search this article

Abstract

A latest CDQ has been installed at No. 4 coke oven in Fukuyama Works.<BR>CDQ in Fukuyama has been designed on the basis of the operational experience gained over the years at Keihin Works. It is an effective facility which has a production rate of 110 t per h and incorporates with developed equipments such as a multi-stage flue, a rotating coke bucket and a multi-function turbine. The commercial operation was started in February, 1986. Since then, this CDQ facility has been operating successfully and contributing to energy savings in Fukuyama Works.

Journal

  • Tetsu-to-Hagane

    Tetsu-to-Hagane 74 (6), 970-977, 1988

    The Iron and Steel Institute of Japan

Details 詳細情報について

Report a problem

Back to top