復興曲線を用いたインドネシアにおける2004年インド洋津波被災地の建物・インフラ復興過程の比較分析  [in Japanese] Comparative Analysis of Recovery and Reconstruction Process in Indonesia after the 2004 Indian Ocean Tsunami using Recovery Curves for Buildings and Urban Infrastructure  [in Japanese]

Access this Article

Search this Article

Author(s)

    • 杉安 和也 SUGIYASU Kazuya
    • 筑波大学大学院システム情報工学研究科 Graduate School of Systems and Information Engineering, University of Tsukuba
    • 村尾 修 MURAO Osamu
    • 筑波大学大学院システム情報工学研究科 Graduate School of Systems and Information Engineering, University of Tsukuba

Abstract

As of December 2008, four years passed after the 2004 Indian Ocean Tsunami and lots of urban infrastructure related to the recovery projects had been constructed in the most damaged area, Aceh, Indonesia. It is significant for other big cities to monitor the recovery process of the stricken area in Aceh to make counterplans and recovery plans to prepare great disasters in the feature. The authors analyzed recovery process of buildings and urban infrastructure in Indonesia using recovery curves and the policy of reconstruction. In this paper the difference between the actual process of reconstruction and prepared rehabilitation plan of the recovery projects are clarified.

Journal

  • Journal of social safety science

    Journal of social safety science 12, 11-20, 2010-03-01

    地域安全学会事務局

References:  20

Codes

  • NII Article ID (NAID)
    110009484139
  • NII NACSIS-CAT ID (NCID)
    AA11542656
  • Text Lang
    JPN
  • Article Type
    Journal Article
  • ISSN
    13452088
  • NDL Article ID
    10903855
  • NDL Source Classification
    ZN5(科学技術--建設工学・建設業--都市工学・衛生工学) // ZA15(政治・法律・行政--行政・行政学--警察・消防・防災)
  • NDL Call No.
    Z74-B757
  • Data Source
    CJP  CJPref  NDL  NII-ELS  NDL-Digital 
Page Top