組立時間と部品の納入周期を考慮した製品の投入順序決定法

書誌事項

タイトル別名
  • Sequencing Method for Products with Consideration of Assembly Time and Parts Delivery Cycle Time

抄録

To keep the consumption rate of each part is very important for mixed-model assembly line scheduling in JIT production system. The goal chasing method (GC) and a number of papers have been proposed to achieve the parts usage leveling goal. These methods keep the consumption speed of parts constant as much as possible, and aim to decrease the amount of the stock in pre-process indirectly. In this paper, we set objective function based on the stock in pre-process directly. The function is influenced by different assembly time and delivery cycle among each product. And we have proposed the sequencing method. The method is concept of time-based goal chafing method (TBCG) with consideration in parts delivery cycle. By numerical experiments, effect of proposed method is presented.

収録刊行物

参考文献 (6)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ