PERFORMANCE OF WAVE RESONATORS LOCATED AT A HARBOR ENTRANCE FOR REDUCING VERY LONG WAVES
Bibliographic Information
- Other Title
-
- 港口部共振装置による長周期波の制御効果に関する研究
Abstract
A resonator-like breakwater facility was constructed at the entrance of Port of Long Beach (Pier J) to shelter the harbor basin from comparatively long waves having a period of about one minute or longer. Major purpose of the resonator-like breakwater is to reduce long-period ship motions during cargo handling at the pier. In order to improve the performance of the breakwater facility especially for much longer period waves, say greater than a few minutes, we have already proposed a modified resonator. It has a pair of additional walls connecting to the nearshore side jetties of the previous rectangular resonator. In this study, performance of the modified resonator for protecting the harbor basin from very long waves has been examined as compared to that of the previous rectangular resonator. As an additional examination, influence of the obliquely incident waves to the harbor on the performance was also clarified.
Journal
-
- Journal of Japan Society of Civil Engineers, Ser. B3 (Ocean Engineering)
-
Journal of Japan Society of Civil Engineers, Ser. B3 (Ocean Engineering) 67 (2), I_892-I_896, 2011
Japan Society of Civil Engineers
- Tweet
Details 詳細情報について
-
- CRID
- 1390282680330581888
-
- NII Article ID
- 130004558524
-
- ISSN
- 21854688
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
- KAKEN
-
- Abstract License Flag
- Disallowed