ANALYSIS OF BIDDING RESULTS IN PROJECTS TO WHICH TECHNICAL PROPOSAL TYPE OF COMPREHENSIVE BIDDING EVALUATION METHOD IS APPLIED
-
- DAKE Naohito
- 鹿島建設株式会社 海外支店
-
- OZAWA Kazumasa
- 東京大学 大学院工学系研究科社会基盤学専攻
Bibliographic Information
- Other Title
-
- 高度技術提案型総合評価方式における入札結果の現状分析
Abstract
The objective of this paper is to make a statistical analysis on bidding results in projects in 2006 to 2010 to which technical proposal type of comprehensive bidding evaluation method is applied by Ministry of Land, Infrastructure, Transport and Tourism so as to evaluate the current competitive situation. It was found by analytical results that intensive price competition lower than the critical investigation price has occurred especially in projects which are categorized in tunnel construction, shield tunnel construction and prestressed concrete construction. Furthermore, it was revealed that numbers of bidders were more and the difference between the highest score and the second highest one were smaller in above 3 categories of projects than those in the other categories of projects.
Journal
-
- Journal of Japan Society of Civil Engineers, Ser. F4 (Construction and Management)
-
Journal of Japan Society of Civil Engineers, Ser. F4 (Construction and Management) 68 (3), 211-219, 2012
Japan Society of Civil Engineers
- Tweet
Keywords
Details 詳細情報について
-
- CRID
- 1390282680331271424
-
- NII Article ID
- 130004560062
-
- ISSN
- 21856605
-
- Text Lang
- ja
-
- Data Source
-
- JaLC
- Crossref
- CiNii Articles
- KAKEN
-
- Abstract License Flag
- Disallowed