MAINTENANCE PLANNING IN CONSIDERATION OF CHANGE OF SCHEDULE IN BRIDGES ASSET MANAGEMENT

DOI 1 References Open Access

Bibliographic Information

Other Title
  • 橋梁群のアセットマネジメントにおける予定の変更を考慮した補修計画策定

Abstract

The purpose of this study is to develop an optimization method of maintenance planning of bridges for the asset management. It is realistically difficult to keep the safety of all bridges within a limited budget. Furthermore, the increase of the number of bridges treated in an optimization significantly increases the number of combination of solution candidates and the difficulty of optimization. Because an optimization of maintenance planning for multiple bridges is effective to decrease an annual cost, it is necessary to overcome this problem. In this paper, an attempt is made to propose a method making optimal plans in response to various objectives such as the cost saving, the improvement of safety and the adaptation to uncertainties. This method improves the flexibility of plan against the change of schedule by basing on the preventive maintenance. In the proposed method, various candidates of plan for each bridge are created in consideration of the preventive maintenance. Then, a combination of candidates corresponding to the purpose of planning is searched. A numerical experiment was presented to demonstrate that the proposed method could develop an optimal plan based on a safety level different from bridge to bridge.

Journal

References(1)*help

See more

Related Projects

See more

Details 詳細情報について

  • CRID
    1390001205351308544
  • NII Article ID
    130004961354
  • DOI
    10.2208/jscejam.70.i_959
  • ISSN
    21854661
  • Text Lang
    ja
  • Data Source
    • JaLC
    • Crossref
    • CiNii Articles
    • KAKEN
  • Abstract License Flag
    Disallowed

Report a problem

Back to top