ANALYSIS OF BIDDING RESULTS IN PROJECTS TO WHICH WTO STANDARD TYPE OF COMPREHENSIVE BIDDING EVALUATION METHOD IS APPLIED CONSIDERING BIDDERS' BEHAVIOR

DOI

Bibliographic Information

Other Title
  • 入札結果が応札行動に影響することに着目したWTO標準型総合評価方式の現状分析

Abstract

 This paper aims to make a statistical analysis on bidding results in projects to which WTO standard type of comprehensive bidding evaluation method is applied by Ministry of Land, Infrastructure, Transport and Tourism so as to verify the situation called "the game where all bidders guess the employer's estimate". Furthermore, this paper also clarifies the reason behind the bidding system which causes such situation considering bidders' behavior. It was confirmed by analytical results that such situation has occurred since 2007. And it was also clarified by the analysis on bidders' behavior in the same repeated games that reasons leading such situation were lower limit price as well as too many bidders and limited scope of technical proposal.

Journal

Related Projects

See more

Details 詳細情報について

  • CRID
    1390001205354815744
  • NII Article ID
    130004962269
  • DOI
    10.2208/jscejcm.69.1
  • ISSN
    21856605
  • Text Lang
    ja
  • Data Source
    • JaLC
    • Crossref
    • CiNii Articles
    • KAKEN
  • Abstract License Flag
    Disallowed

Report a problem

Back to top