Simulation Model for Estimating Train Operation to Recover Knock-on Delay Earlier

DOI

抄録

Small irregularities in service are leading to significant delays in the urban railway system of Tokyo, Japan, because the rail system is now operating very close to its capacity. The delay factor, however, varies by hour. The increase in train running time becomes the major cause of delay during peak periods because this has become longer than that of dwelling time. However, there is limited data availability concerning the behavior of train under the delay. So, the delay time increase due to interaction between trains is not properly accounted for. No research has yet been carried out to specifically examine a feasible operating method which can recover the knock-on delay early under high frequency operation. Therefore, this research formulated a train operation simulation model which reproduces the behavior of train operation. The simulation model is taking into account the interaction between the trains. Using the simulation model, this study attempts to understand the actual situation of train operation under the knock-on delay. Finally, this paper suggests a practical method to recover the knock-on delay earlier, which involves keeping a moderate separation between trains during running time.

収録刊行物

  • Asian Transport Studies

    Asian Transport Studies 2 (3), 284-294, 2013

    Eastern Asia Society for Transportation Studies

詳細情報 詳細情報について

  • CRID
    1390282680341742336
  • NII論文ID
    130004965114
  • DOI
    10.11175/eastsats.2.284
  • ISSN
    21855560
  • 本文言語コード
    en
  • データソース種別
    • JaLC
    • CiNii Articles
  • 抄録ライセンスフラグ
    使用不可

問題の指摘

ページトップへ