Pilot-Scale Tests of Nitrogen Removal from Ammonium Plant Effluent Using Anaerobic Ammonium Oxidation System

Bibliographic Information

Other Title
  • アナモックス反応による化学工場排水中の窒素処理実証
  • アナモックス ハンノウ ニ ヨル カガク コウジョウ ハイスイ チュウ ノ チッソ ショリ ジッショウ

Search this article

Abstract

Pilot-scale tests were carried out for nitrogen removal from ammonium plant effluent using gel carriers on which anaerobic ammonium oxidation (anammox) sludge was immobilized. The nitrogen removal system was equipped with an anammox vessel of 5 m3 volume and the pretreatment processes were carried out for continuous feeding tests. The nitrogen removal in the anammox vessel could be started up within approximately 2 months of acclimation using ammonia synthetic plant effluent (ammonia wastewater) at 30°C. After that, stable nitrogen removal in the anammox vessel was confirmed at 16.1°C even though the influent was changed to another kind of wastewater based on urea. Moreover, nitrogen removal in the anammox vessel reached the designated denitrification rate within 3 days at 30°C after influent wastewater was returned to the original ammonia wastewater. Finally, the anammox vessel was operated using the ammonia wastewater at a low water temperature. The nitrogen conversion rate was stably observed 1.9 kg-N•m3•d-1 at 17.1°C. These results strongly suggest that this nitrogen removal system using anammox gel carrier can be applied to nitrogen removal from industrial effluent under low water temperature.

Journal

Citations (1)*help

See more

References(14)*help

See more

Details 詳細情報について

Report a problem

Back to top