VERIFICATION OF TWO EASY AND TEMPORAL REPAIR METHODS FOR FATIGUE CRACKS USING MECHANICAL JOINTS

DOI

Bibliographic Information

Other Title
  • 機械式接合を用いた疲労き裂の簡易応急補修法の検証

Abstract

In this study, the use of high performance vises are proposed as two easy and temporal repair methods of repairing fatigue cracks in steel bridge members. These repair methods could temporarily decrease crack growth rate until executing permanent repair works. In this paper, to investigate the repairing effect of crack growth by the proposed methods, fatigue crack growth tests and FE analysis for MT and steel girder specimens were carried out. These results showed the proposed method could control the crack growth rate.

Journal

  • Kou kouzou rombunshuu

    Kou kouzou rombunshuu 22 (85), 85_59-85_70, 2015

    Japanese Society of Steel Construction

Related Projects

See more

Details 詳細情報について

  • CRID
    1390001205315775744
  • NII Article ID
    130005152644
  • DOI
    10.11273/jssc.22.85_59
  • ISSN
    18840329
    18809928
  • Text Lang
    ja
  • Data Source
    • JaLC
    • CiNii Articles
    • KAKEN
  • Abstract License Flag
    Disallowed

Report a problem

Back to top