需要予測の不確実性を考慮した電力融通供給型集合住宅内SOFC群ロバスト統合運用計画決定手法  [in Japanese] Robust Operation Planning Method for Integrated Solid Oxide Fuel Cells in a Collective Housing with Electric Power Interchange System Considering Uncertainty in Demand Forecast  [in Japanese]

Access this Article

Search this Article

Author(s)

    • 加藤 瑠奈 Kato Runa
    • 早稲田大学先進理工学研究科 Graduate School of Advanced Science and Engineering, Waseda University
    • 藤本 悠 Fujimoto Yu
    • 早稲田大学 スマート社会技術融合研究機構 Advanced Collaborative Research Organization for Smart Society, Waseda University

Abstract

The subject of this study is to propose a power interchange system in a collective housing with residential solid oxide fuel cells (SOFCs) and a robust operation planning method for integrated SOFCs against uncertain energy demand forecast. In this method, the future operation plan for multiple SOFCs is optimized and determined to minimize the expected total primary energy consumption in the collective housing considering uncertainty in demand forecast. If the forecast energy demand includes forecast errors, the result of SOFCs operation will corrupt from the viewpoint of the primary energy consumption. Thus, the output decision problem for SOFCs is formulated by considering the corruption caused by forecast errors, so that the decided SOFC outputs have the robustness against uncertainty in demand forecast. The validity of the proposed method is examined based on numerical simulations from the perspective of the robustness.

Journal

  • IEEJ Transactions on Power and Energy

    IEEJ Transactions on Power and Energy 136(6), 528-536, 2016

    The Institute of Electrical Engineers of Japan

Codes

  • NII Article ID (NAID)
    130005155099
  • NII NACSIS-CAT ID (NCID)
    AN10136334
  • Text Lang
    JPN
  • ISSN
    0385-4213
  • NDL Article ID
    027488558
  • NDL Call No.
    Z16-794
  • Data Source
    NDL  J-STAGE 
Page Top