固定価格買取制度以降の中国地方の小水力発電の展開

書誌事項

タイトル別名
  • Small-Scale Hydroelectric Power Deployment in Chugoku Region after Introduction of Feed-in Tariff

抄録

<p>This study examines the deployment of small-scale hydroelectric power enterprises (1,000 kW or less), operated for more than 40 years by a farmers’ organization or a town office in the Chugoku region, since the introduction of a feed-in tariff (FIT) scheme. A survey of the operating organizations in Okayama Prefecture revealed that the FIT introduction enabled the renewal of outdated and inefficient facilities. The results indicated it was not whether the small hydropower enterprises were operated by local community but profitability that allowed the operating organizations to maintain them. However, small hydropower installations have become widespread recently in the service of public interest—for example, to secure power in readiness for disaster or to revitalize rural area. Therefore, sustainable small hydropower manage­ment must also devote equal attention to economic and social considerations to become fully efficient and community-centric.</p>

収録刊行物

被引用文献 (1)*注記

もっと見る

参考文献 (2)*注記

もっと見る

関連プロジェクト

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ