Estimating the Long-term Availability of Unused Materials for Woody Biomass Power Generation in Tochigi Prefecture, Japan

Bibliographic Information

Other Title
  • 栃木県における木質バイオマス発電のための長期的な未利用材利用可能量推計
  • トチギケン ニ オケル モクシツ バイオマス ハツデン ノ タメ ノ チョウキテキ ナ ミリヨウザイ リヨウ カノウリョウ スイケイ

Search this article

Abstract

<p>This study estimated the supply potential and availability of unused materials for woody biomass power generation in the Japanese cedar and cypress forests of Tochigi Prefecture. Then, the long-term possibility of supplying fuel woods to the existing power generation plant and the locations of the newly established power generation plants were examined. As a result, supply potentials of used and unused materials were estimated at 1,003,745 m3/year and 394,042 tons/year respectively, whereas those availabilities were estimated at 430,561 m3/year and 169,125 tons/year respectively. Although those availabilities were reduced to 102,835 m3/year and 40,110 tons/year, respectively, while considering profits of forest owners, this availability of unused materials could meet the demand of the existing power generation plant which consumed 35,000 tons/year. Furthermore, small-scale gasification power generation plants could be installed in two cities of Tochigi Prefecture using the surplus availability of unused materials with profits for forest owners.</p>

Journal

Citations (7)*help

See more

References(2)*help

See more

Related Projects

See more

Details 詳細情報について

Report a problem

Back to top